Waterline No 29—December 2001
The five-port average crane rate declined to 25.8 containers per hour for the September quarter 2001.
- Waterline No 29
Australian Sea Freight, 1999–2000
The Australian Sea Freight series presents statistics on the movement of Australian freight by sea, as well as information on port activity, fleet structure, and use of coastal permits. This edition focuses on sea freight activity around Australia during 1999–2000.
- Australian Sea Freight, 1999–2000
Waterline No 30—March 2002
The five-port total container traffic increased to 1.740 million teus during July–December 2001. Berth availability was 95 per cent in the December quarter.
- Waterline No 30
Waterline No 31—June 2002
The five-port total container traffic increased to 1.740 million teus during July–December 2001. Berth availability was 95 per cent in the December quarter.
- Waterline No 31
Australia's Seaborne Containerised Freight: Forecasts to 2010–11
This study analyses and forecasts trends in the usage of containers for the carriage of Australia's seaborne freight over the period 2001–02 to 2010–11. The study also estimates the proportion of 40-foot containers used in Australia's inbound and outbound seaborne trade and assesses the implications of their increasing use over time.
- Australia's Seaborne Containerised Freight: Forecasts to 2010–11
Waterline No 32—September 2002
The five-port average crane rate improved from 26.6 in the March quarter to 26.9 containers per hour for the June quarter 2002. This is the highest five-port average crane rate ever recorded in Waterline.
- Waterline No 32
Australia's Seaborne Containerised Freight
This publication forecasts container movements into and out of Australia. Combined Australian containerised imports and exports are expected to increase at an average annual rate of 5 per cent over the period 2001–02 to 2010–11.
- Australia's Seaborne Containerised Freight
Waterline No 33—December 2002
Waterline's format has remained largely unchanged since the first issue was produced in 1994. However, there have been many changes in the maritime industry in that time. The Bureau believes that Waterline needs to change too if it is to remain useful.
- Waterline No 33
Bass Strait Passenger Vehicle Equalisation Scheme BTRE Monitoring Report No.5 2000–01
This report presents the results of BTRE's fifth annual review of the Bass Strait Passenger Vehicle Equalisation Scheme. It covers the operation and impact of the Scheme up to (and including) 2000–01.
- BSPVES Monitoring Report 5
Greenhouse Gas Emissions to 2020: Projected Trends for Australian Transport
BTRE has completed projected greenhouse gas emissions and energy use by the Australian transport sector using two different methods.
- Greenhouse Gas Emissions to 2020: Projected Trends for Australian Transport
Pagination
- Previous page
- Page 14
- Next page