Sandy Hollow—Maryvale Railway: Economic Evaluation of Proposed Completion

Sandy Hollow—Maryvale Railway: Economic Evaluation of Proposed Completion default cover
Research Report

Sandy Hollow—Maryvale Railway: Economic Evaluation of Proposed Completion

The uncompleted Sandy Hollow-Maryvale railway in New South Wales has a somewhat chequered history. It was finally begun in 1936 after inquiries stretching back to 1911. Construction was slowed to almost a standstill by World War II, accelerated in the early post war years and then abandoned in 1951 due to a shortage of capital.

Subsequent moves to complete the railway foundered in the face of unfavourable economic assessment.

This report presents the results of an economic benefit-cost analysis of a recent proposal for the completion of the railway against the background of the discovery of massive proven coal reserves along the line.